Scores by kind of claim
Each kind of claim is scored on its own, out of 100: the share that held up, with the range it likely falls in. Fewer resolved claims give a wider range.
-
Factual claims
Statements about the present or the past, checked against the record: did they hold up?
76 70 81 -
Predictions
Statements about events outside the person's control, checked once they fell due: did they come true?
68 54 82 -
Promises
Commitments to the person's or organisation's own future action, with something to deliver: was it delivered?
Insufficient record: 3 promises resolved, 5 needed for a score.
All types combined: 74 (likely 69 to 80, high confidence), from 96 claims: 82 factual claims, 14 predictions. It mixes kinds of claim in different proportions for different people, so compare people kind by kind.
Bill Ackman's claims
42 claims
“The culmination of these variables has created an unprecedented backlog in professional home improvement projects heading into 2022”
Pershing Square letter authors (Ackman) 2022 Bill Ackman's Pershing Square 2021 Annual Letter to Shareholders (GuruFocus)
There is an unprecedented backlog in professional home improvement projects heading into 2022.
Mostly true True in substance, wrong in a detail.
The second judge said resolved true; the verdict shown is the first judge's.
Said for an organisation they lead or work for; it counts on both records.
What would count as true or false
Judge as of early 2022. True if contemporaneous industry data or reports (e.g. Harvard Joint Center for Housing Studies, NAHB, Home Depot/Lowe's commentary on Pro customers, contractor backlog surveys) show professional/contractor home improvement project backlogs heading into 2022 were at record or historically unprecedented levels. Mostly true if backlogs were at or near record highs (e.g. highest in many years or among the highest on record) though not strictly unprecedented. Mixed if backlogs were elevated well above normal but data show comparable or higher levels in earlier periods. Mostly false if backlogs were only modestly above normal, so 'unprecedented' substantially overstates it. False if data show professional home improvement backlogs were at or below normal levels heading into 2022.
Evidence
- Construction and Design Firms See Considerable Backlogs Going Into Q4 2021 Houzz (Pro blog) · 4 November 2021
“Going into the fourth quarter of 2021, backlogs at architectural and design firms are at their longest in four years, since the barometer began tracking them; the average is now 9.3 weeks, up from 4.5 weeks year over year.”
- Construction and Design Firms See Considerable Backlogs Going Into Q4 2021 Houzz (Pro blog) · 4 November 2021
“Project backlogs for design and construction companies have been increasing steadily since the beginning of the pandemic and are now reaching record highs, the Houzz Renovation Barometer has found.”
- Year in Review and What’s Ahead for Pros Houzz (Pro blog) · 11 January 2022
“With design and construction firms unable to keep up with demand, project backlogs gradually escalated over the year, reaching record highs.”
- Remodelers Head Into 2022 With Cautious Optimism ProRemodeler (citing NAHB/Royal Building Products Remodeling Index) · 27 December 2021
“Of the two indices that measure attitudes about future conditions—sentiment regarding the rate of new leads registered 83, up five points from the third quarter of 2020, while the backlog of remodeling jobs climbed eight points year-over-year to 85.”
Reasoning
The Houzz Renovation Barometer reported that design and construction project backlogs were reaching record highs going into Q4 2021 [E2], and Houzz's January 2022 review said they escalated over 2021 to record highs [E3]. Architectural and design firm backlogs averaged 9.3 weeks, up from 4.5 weeks a year earlier [E1]. However, those backlogs were the longest only "since the barometer began tracking them" four years earlier [E1], so the record covers a short period. The NAHB/Royal Building Products remodeling backlog index rose eight points year over year to 85 [E4], which shows a strong rise, but the quote does not say it was a record. Backlogs were clearly at or near record highs, but the evidence does not fully support calling them historically "unprecedented".
Cite this claim
Bill Ackman, “There is an unprecedented backlog in professional home improvement projects heading into 2022.” (said 2022). Verdict: mostly true. Reliability API, claim c_d70d7907a841, method 0.1.0+c876030c. https://epistacklabs.com/claims/c_d70d7907a841
Claims without a verdict
- Unresolvable 135
- Not yet due 9
- Own records only 29
- Not researched 162
- Not checkable 431
Is a verdict here wrong, or do you speak for Bill Ackman? Reply on the claim's own page, with the form at its foot (how replies work). Verdicts are made automatically; how verdicts and scores are made.