Scores by kind of claim
Each kind of claim is scored on its own, out of 100: the share that held up, with the range it likely falls in. Fewer resolved claims give a wider range.
-
Factual claims
Statements about the present or the past, checked against the record: did they hold up?
80 74 86 -
Predictions
Statements about events outside the person's control, checked once they fell due: did they come true?
Insufficient record: 4 predictions resolved, 5 needed for a score.
-
Promises
Commitments to the person's or organisation's own future action, with something to deliver: was it delivered?
85 74 94 -
Guidance
A company's own figures for its results over a period, checked against what it then reported.
Insufficient record: 0 guidance claims resolved, 5 needed for a score.
All types combined: 81 (likely 76 to 86, high confidence), from 86 claims: 70 factual claims, 16 promises. It mixes kinds of claim in different proportions for different people, so compare people kind by kind.
Mark Zuckerberg's claims
42 claims
“This is only a matter of time but it's not going to be next year.”
Mark Zuckerberg, Meta CEO, interviewee 18 April 2024 Mark Zuckerberg - Llama 3, Open Sourcing $10b Models, & Caesar Augustus (Dwarkesh Podcast)
A 1GW data center will be built eventually, but not in 2025 (next year).
Resolved true The record shows it happened or was so.
The second judge would not resolve this claim; the verdict shown is the first judge's.
What would count as true or false
The core of this prediction is that no 1GW data center would be built in 2025. 'Built' means a single data center or campus reaching about 1 gigawatt of operational (energised) capacity. True: credible reporting through the end of 2025 shows that no single data center reached about 1GW of operational capacity during 2025, and 1GW projects (for example Meta's Prometheus or Hyperion, Stargate, or xAI's Colossus expansions) were under construction or planned, which is consistent with 'only a matter of time'. Mostly true: no facility reached 1GW in 2025, but one came close to it in late 2025 in a way that is open to dispute. Mostly false: a facility was credibly reported to have reached about 1GW of operational capacity in 2025, but only in late 2025, or only by counting several sites or announced rather than energised capacity. False: one or more single-site data centers clearly reached 1GW or more of operational capacity during 2025. Announced or planned capacity alone does not count as 'built'.
Evidence
- Largest AI data center power: doubling every 10 months Epoch AI · 4 September 2026
“Observed frontier | 2025-12-23 | 626.00 | Anthropic-Amazon New Carlisle | Amazon | Anthropic”
- Largest AI data center power: doubling every 10 months Epoch AI · 4 September 2026
“The current record-holder is xAI’s Colossus 2, at an estimated 950 MW.”
- Elon Musk's xAI brings 1GW Colossus 2 AI training cluster online Teslarati · 18 January 2026 Own record
“In a post on X, Musk stated that Colossus 2 is already operational, making it the first gigawatt training cluster in the world.”
- Colossus 2 Everydatacenter · 20 March 2024
“Our records put first power in Oct. 2025.”
Reasoning
Epoch AI's independent tracker puts the largest observed AI data center as of 2025-12-23 at 626 MW (Anthropic-Amazon New Carlisle) [E1], well short of 1 GW. Its later record-holder, xAI's Colossus 2, is estimated at 950 MW as of September 2026 [E2]. Colossus 2 first drew power in October 2025 [E4], and the claim that it was an operational gigawatt cluster came from Musk in January 2026 [E3], so a 1 GW-scale project was under construction but not operational at 1 GW during 2025. This fits the prediction that a 1 GW data center would not be built in 2025 but was "only a matter of time."
Cite this claim
Mark Zuckerberg, “A 1GW data center will be built eventually, but not in 2025 (next year).” (said 18 April 2024). Verdict: resolved true. Reliability API, claim c_5f48bb722de2, method 0.1.0+3f84d14d. https://epistacklabs.com/claims/c_5f48bb722de2
Claims without a verdict
- Unresolvable 144
- Not yet due 17
- Own records only 41
- Not researched 223
- Not checkable 1,060
Is a verdict here wrong, or do you speak for Mark Zuckerberg? Reply on the claim's own page, with the form at its foot (how replies work). Verdicts are made automatically; how verdicts and scores are made.