Scores by kind of claim
Each kind of claim is scored on its own, out of 100: the share that held up, with the range it likely falls in. Fewer resolved claims give a wider range.
-
Factual claims
Statements about the present or the past, checked against the record: did they hold up?
72 67 78 -
Predictions
Statements about events outside the person's control, checked once they fell due: did they come true?
Insufficient record: 1 prediction resolved, 5 needed for a score.
-
Promises
Commitments to the person's or organisation's own future action, with something to deliver: was it delivered?
Insufficient record: 4 promises resolved, 5 needed for a score.
-
Guidance
A company's own figures for its results over a period, checked against what it then reported.
Insufficient record: 1 guidance claim resolved, 5 needed for a score.
All types combined: 72 (likely 67 to 78, high confidence), from 101 claims: 101 factual claims. It mixes kinds of claim in different proportions for different people, so compare people kind by kind.
Jensen Huang's claims
49 claims
“Because the land, power and shell is already $15 billion.”
Jensen Huang, NVIDIA CEO 26 September 2025 Transcript: Jensen Huang on OpenAI, Future of Compute (BG2 Pod) (Singju Post)
The land, power and shell for such a data center already come to $15 billion.
Mostly true True in substance, wrong in a detail.
The second judge would not resolve this claim; the verdict shown is the first judge's.
Said for an organisation they lead or work for; it counts on both records.
What would count as true or false
Judge as of 2025-09-26. In context, the claim is that land, power infrastructure and the building shell for the data center under discussion (a roughly 1-gigawatt AI data center, per the interview) come to about $15 billion. True: credible industry or analyst estimates, or project disclosures, put these non-compute costs at roughly $12–18B for that capacity. Mostly true: estimates fall within about $10–20B. Mixed: estimates vary widely, with some near $15B and others well outside it. Mostly false: credible estimates are substantially different but of the same order (for example, $5–10B or $20–30B). False: estimates differ by more than about a factor of two (under about $7B or over about $30B).
Evidence
- Bloomberg Pegs Abilene 1GW AI Data Center at $30B, $17B on Chips | AI Weekly AI Weekly (reporting a Bloomberg analysis by Lynn Doan, with Cushman & Wakefield cost breakdown) · 12 October 2026
“Power infrastructure runs another $3 billion. Shell and construction cost $2.4 billion.”
- What an AI data center costs per megawatt and per gigawatt Safeguard.sh (blog) · 19 October 2026
“Published estimates for the building, power and cooling of a modern data center run from roughly 11 to 18 million dollars per megawatt, which is 11 to 18 billion dollars per gigawatt, before any chips.”
- Data Center Update - October 2026 Houlihan Lokey · October 2026
“On a total development budget of ~$10 million–$13 million per MW development budget, building shells now comprise a mere 9%–14% of the total budget, with MEP comprising 70%+.”
- 100 MW of AI Data Center Capacity: About $1.1 Billion for the Building, Nearly $4 Billion With the Chips - EnergyNews.biz EnergyNews.biz · 19 October 2026
“Epoch AI’s May 2026 model of a typical US hyperscaler AI campus puts upfront capital at $37.9 billion per gigawatt of IT capacity, of which the facility accounts for $11.4 billion, or 30.2%.”
Reasoning
E2 cites published estimates of about $11–18 billion per gigawatt for building, power and cooling before chips, which brackets $15 billion. E3 gives a total development budget of about $10–13 million per MW, or about $10–13 billion per gigawatt, and E4 cites Epoch AI's model putting the facility at $11.4 billion per gigawatt. E1's title puts a 1 GW campus at $30 billion, $17 billion of it chips, which leaves about $13 billion for everything else. Taken together, the estimates fall within about $10–20 billion, but several sit below the $12–18 billion band, so this meets mostly true rather than true. All of these sources are dated 2026, after the 2025-09-26 judgment date, so they are later estimates of these costs.
Cite this claim
Jensen Huang, “The land, power and shell for such a data center already come to $15 billion.” (said 26 September 2025). Verdict: mostly true. Reliability API, claim c_8e0375cc2466, method 0.1.0+03d23c0e. https://epistacklabs.com/claims/c_8e0375cc2466